CFU Flash Drum Project
project details
Client:
VTTI FUJAIRAH TERMINALS LIMITED FZC
Client Location:
Fujairah, UAE
Start:
Sep-2023
End:
Jun-2024
CFU Flash Drum Project
- Design, manufacturing, Testing, Painting & installation of a new flash drum in VTTI CFU unit.
- Structural adequacy analysis of existing CFU structure and necessary modification of structure for accommodating the new CFU Flash drum.
- Installation of 4 Nos new pumps including civil foundation design and construction.
- Associated process piping works and Electrical & Instrumentation works.
- Modification of existing piping and rerouting works for accommodating new piping associated with this project.
- Rerouting of underground Firewater HDPE line, other utility lines and associated civil works.