Ecomar Storage Terminal Project
project details
Client:
Ecomar Energy Solutions
Client Location:
Fujairah, UAE
EPCC Main Contractor:
Intrakat Societe Anonyme Technical and Energy Products, Fujairah
Start:
Nov-2023
End:
On Going
Ecomar Storage Terminal Project
Engineering, procurement, construction, and commissioning of phase 1 of the project for 700,000 CuM of storage facilities with associated infrastructures. The storage Comprises of 350,000 Cum of Black Oil and 350,000 CuM of White Oil. The facility also includes interconnecting pipeline (8 lines) to the Jetty Manifold. The fully automated terminal with the state-of-the-art technology and backed up with diesel generator and fully protected facilities with fire protection systems.