Fire Water Tank

project details

Client: VTTI Terminal
Client Location: Fujairah, UAE
Start: Jul-2021
End: Mar-2022

Brochure

Download our document to see specific data of the service and how we work.

COMPANY PROFILE

Fire Water Tank

  1. Engineering, Material Supply, Installation, Testing and Commissioning of the Fire Water Tank system at VTTI Terminal, Fujairah.
  2. The scope of work includes fabrication, erection, of FW Tank with associated civil, structural, mechanical, piping, electrical and instrumentation works.
Open chat
Welcome to HiapSeng Engineering